A while back I was developing a workflow scheduler. However the run duration kept coming back negative. The runs kept finishing like 15 seconds before they started. Eventually I figured out why; the company had configured a policy to use their custom NTP server, but it was 16.7 seconds off. So my Windows laptop’s time was in the future, but the WSL VM (which ran the program) used another NTP server and was correct. In the end I just added a bodge that made the program request the time from an external server on startup to calculate an offset.

  • Simulation6@sopuli.xyz
    link
    fedilink
    arrow-up
    0
    ·
    17 hours ago

    Person before flipped a bunch of if checks to put the value before the variable (if 6==x rather then if x==6). They messed up a bunch of the <= and >= checks by forgetting to reverse them. I improved performance and fixed numerous bugs by tracking those down.